How to read a tree root survey for a subsidence claim

A root survey lands on your desk attached to a subsidence claim and it's thirty pages of Latin names, soil descriptions and a recommendation you're expected to act on by Friday. Most of it is boilerplate. A handful of lines decide whether the claim is a vegetation-management job or an underpinning job, and knowing which lines they are saves you re-reading the whole thing every time.
What the report is telling you
Strip it back and an arboricultural report for a subsidence claim is answering three questions: what's growing near the property, how thirsty is it, and is it close enough to matter. The species list with a water demand classification (high, moderate or low) is the one surveyors hang everything else on. An oak or a poplar rated high demand within ten metres of a foundation on shrinkable clay is a different claim to a low-demand shrub at twenty metres. If the report doesn't give you a water demand rating against every tree named, that's a gap worth querying before you accept the recommendation.
The distance tables matter more than they look. Surveyors often express proximity as a ratio of distance to mature height, not just metres from the wall. A tree at eight metres sounds safe until you see it's rated to reach twenty-five metres at maturity. That ratio is doing the real work in the "is this tree implicated" judgment, more than the raw distance figure a loss adjuster might quote back to you.
Then there's the soil. The report should reference the clay type, usually tied to a shrinkage potential (high, medium or low, sometimes expressed against the modified plasticity index). A high-demand tree over low-shrinkage clay has limited scope to drive movement on its own. The same species over high-plasticity London Clay, with no trial pit data to rule shrinkage in or out, is being asked to carry most of the causal weight in the report. If the surveyor hasn't pulled a trial pit or referenced a site investigation for the clay classification, flag it before you sign off on the causation line.
The vegetation management plan, and what it won't give you
The back half of the report is usually the recommendation: crown reduction, pollarding, removal, or a root barrier installed between the tree and the foundation. This is where cost gets decided, and it's worth reading critically rather than rubber-stamping. Removal is the cheapest-sounding option on paper but isn't always the right one, particularly where the tree is protected by a preservation order or sits on a neighbouring property you have no authority over. A root barrier is a smaller, more targeted intervention and increasingly the default where the tree can reasonably stay.
The report is a snapshot: this tree, this soil, this distance, assessed on the day the arborist walked the site. It carries no record of how the ground behaved before that visit or how it moved after. It can't tell you whether the ground under that foundation moved six millimetres last summer or whether it's been stable for three years and the crack is historic. Nor does it tell you whether the vegetation management, once actioned, stopped the movement. That's a question about change over time, and a one-off survey was never built to answer it.
Why the claim history looks the way it does
This is the gap that drives a lot of the frustration in this part of the book: the arboricultural report confirms a plausible cause but says nothing about whether the site is still moving, or whether it stopped moving two seasons ago and the works would be wasted spend. Insurers end up either underwriting the recommendation blind or commissioning a second inspection just to get a before-and-after reading, which is slow and only covers the one property that already made a claim.
Structural Movement is built for the sites that haven't claimed yet. It produces a year-over-year elevation record across your book of shrink-swell properties, so you can see which addresses are moving before an arboricultural report becomes necessary, and weigh any root survey that does land against a real history of ground change rather than a single site visit.
If you're tired of every tree report arriving with no context behind it, that's the gap worth closing first.