What is the NHBC traffic light system for clay shrinkage risk?

If you've spent any time in subsidence files, you've probably seen a surveyor's report reference the "traffic light system" from NHBC Chapter 4.2, usually in a sentence like "the property falls in the amber zone for tree proximity." It's worth knowing what that means, because it's a design-stage tool, not a diagnosis of an existing building, and that distinction matters when you're deciding whether a claim is worth a site visit.
What Chapter 4.2 is banding
NHBC Standards Chapter 4.2, "Building near trees," is guidance for new-build foundation design on shrinkable clay. It isn't a traffic light chart in the literal sense NHBC publishes, but assessors and warranty surveyors talk about it that way because the method sorts sites into low, moderate and high risk bands, and most people shorthand those as green, amber and red.
The banding comes from three inputs layered together: the clay's volume change potential (how much it shrinks and swells as moisture content changes, rated low through very high based on plasticity), the water demand category of nearby trees and hedges (species are classified low, moderate or high demand based on root behaviour), and how close the building sits relative to the tree's mature height. Put a high-water-demand species like an oak within a few metres of a shallow strip foundation on high-shrinkage clay, and you're in red. Put a low-demand species well clear of the footprint, and you're in green with no special foundation depth required.
Reading the amber zone
The amber zone is where most of the argument happens, honestly. It's not a hard stop like red, and it's not clear like green. It means the combination of species, distance and soil puts the site into a range where NHBC calls for increased foundation depth or other mitigation at build stage, precisely because the risk isn't negligible but isn't severe either. On a claims desk, amber is the band that produces the most inconsistent outcomes, because whether a property was built to the right depth for its amber rating depends on what happened on site twenty, thirty, sometimes fifty years ago, and that paperwork doesn't always survive.
This is also where the method's age-related limits show up. Chapter 4.2 assumes you're designing a foundation before the building exists. It says very little about what's happening to a building that's already standing next to a tree that's grown substantially since the original assessment, which is most of your book. A semi built in 1975 near a sapling is a different risk profile from the same semi next to the mature tree that sapling became, and the original green rating doesn't update itself.
Why green-amber-red doesn't settle the claim question
Tree proximity banding tells you something true about design intent at the time of construction. It doesn't tell you whether a specific property has moved since. Two houses in the same amber band, same street, same clay, same species, can have completely different settlement histories depending on drainage, past remedial works, or just how close that root system has crept in the intervening decades. Treating an entire amber-rated postcode as one risk, or waiting for the claim to come in before anyone looks at the ground, means you're reacting to the same information the original builder had, not to what's happened since.
That's the gap between a design-stage banding and a measurement of movement over time. Structural Movement is built for that gap: repeat elevation models over a book of properties on shrink-swell clay, compared year over year, so you get a ranked watch-list of which sites are actually showing settlement, not just which ones sit in a historically amber zone. If you're sitting on a book where tree proximity banding is the only risk signal you've got, it's worth looking at what a year-over-year elevation reading would add to it.